− 57 −
⑦ Remove the 4 hexagonal bolts from
the ceiling of the monitor box. A
stepladder should be used to perform
this operation.
PHOTO 8. 2 o
⑧ Working with at least 3 people, pull
out the roof frame from above.
⑨ When placing the roof frame aside,
take care not to pinch fingers or toes.
FIG. 8. 2 a
HEXAGONAL BOLT (4), black
M8×50, w/spring washer, flat washer used
Summary of Contents for AV F-ZERO AX
Page 10: ...3...
Page 11: ...4...
Page 179: ...172...
Page 189: ...182 1 TOP ASSY FZR DX D 1 3...
Page 199: ...192 6 ASSY STEERING MOTOR FZR 1240 D 1 2 Motor Installation Temporary Attachment...
Page 201: ...194 7 ASSY COCKPIT FZR 2000 D 1 2 Fastening Torque Opposite Side...
Page 203: ...196 8 ASSY ACCEL BRAKE SPG 2200 D 1 2...
Page 205: ...198 9 ASSY SEAT FZR 2100 D 1 2...
Page 210: ...203 11 ASSY PILLAR BASE FZR 3000 D 1 2...
Page 212: ...205 12 ASSY SUBCABI BASE FZR 3100 D 1 2...
Page 215: ...208 14 ASSY ROLLING MECHA FZR 3200 D 1 2...
Page 221: ...214 20 ASSY MAIN BD FZR 4000 D 1 2 Do not wire across the diagonal lines...
Page 227: ...220 25 ASSY MONITOR BOX FZR 1100 D 1 2...
Page 229: ...222 26 ASSY SUB MONITOR BOX FZR 1150X D 1 2 SECTION A 201 8 2 104 203 4 1 3 201 44 A A...
Page 234: ...227 30 ASSY COINCHUTE TOWER FZR 1400 D 1 2...
Page 237: ...230 32 CARD UNIT TWIN R VOF 0460 D 1 2 Details of part A A...
Page 241: ...234 35 ASSY FLOOR R FZR 3820 D 1 2...
Page 243: ...236 36 ASSY FLOOR L FZR 3840 D 1 2...
Page 246: ...239 38 ASSY ROOF FRAME FZR 3900 D 1 2...
Page 250: ...243 24 WIRING DIAGRAM D 1 3...
Page 251: ...244 24 WIRING DIAGRAM D 2 3...
Page 252: ...245 24 WIRING DIAGRAM D 3 3...