− 123 −
① Turn off the power.
② Remove the 6 truss screws holding the front lid of the base in place and then remove the lid.
③ Remove the steering VR unit. Unplug the connectors and remove the 2 screws holding the
steering VR bracket in place.
STEERING VR BRACKET
CONNECTOR
PHOTO 12. 1 c
④ Loosen the 2 socket screws holding the gear in place and disengage the gear from the VR axle.
PHOTO 12. 1 d
GEAR
HEXAGON SOCKET SCREW (2 )
M3×6
REPLACEMENT PROCEDURE
SCREW (2)
M4×8, w/flat & spring washers
Summary of Contents for AV F-ZERO AX
Page 10: ...3...
Page 11: ...4...
Page 179: ...172...
Page 189: ...182 1 TOP ASSY FZR DX D 1 3...
Page 199: ...192 6 ASSY STEERING MOTOR FZR 1240 D 1 2 Motor Installation Temporary Attachment...
Page 201: ...194 7 ASSY COCKPIT FZR 2000 D 1 2 Fastening Torque Opposite Side...
Page 203: ...196 8 ASSY ACCEL BRAKE SPG 2200 D 1 2...
Page 205: ...198 9 ASSY SEAT FZR 2100 D 1 2...
Page 210: ...203 11 ASSY PILLAR BASE FZR 3000 D 1 2...
Page 212: ...205 12 ASSY SUBCABI BASE FZR 3100 D 1 2...
Page 215: ...208 14 ASSY ROLLING MECHA FZR 3200 D 1 2...
Page 221: ...214 20 ASSY MAIN BD FZR 4000 D 1 2 Do not wire across the diagonal lines...
Page 227: ...220 25 ASSY MONITOR BOX FZR 1100 D 1 2...
Page 229: ...222 26 ASSY SUB MONITOR BOX FZR 1150X D 1 2 SECTION A 201 8 2 104 203 4 1 3 201 44 A A...
Page 234: ...227 30 ASSY COINCHUTE TOWER FZR 1400 D 1 2...
Page 237: ...230 32 CARD UNIT TWIN R VOF 0460 D 1 2 Details of part A A...
Page 241: ...234 35 ASSY FLOOR R FZR 3820 D 1 2...
Page 243: ...236 36 ASSY FLOOR L FZR 3840 D 1 2...
Page 246: ...239 38 ASSY ROOF FRAME FZR 3900 D 1 2...
Page 250: ...243 24 WIRING DIAGRAM D 1 3...
Page 251: ...244 24 WIRING DIAGRAM D 2 3...
Page 252: ...245 24 WIRING DIAGRAM D 3 3...