
Removal
Prior to performing this procedure you must first follow
these procedures:
•
Shell/Bumper frame removal
•
Flotation module removal
Step 1
Make sure all power is off and the umbilical is disconnected
from the LBV vehicle.
Step 2
Place LBV on starboard side.
Step 3 - #2 Phillips Screwdriver
Remove 3 Phillips pan head screws securing Kort nozzle to
port thruster and remove Kort nozzle.
Step 4
Under no circumstances are the 4 M4x10 socket head button
screws to be removed from Starboard Power Can End Cap.
They are potted to the back plane and will cause irreparable
damage if removed.
Summary of Contents for Generation 2
Page 1: ...Generation 2 Service Maintenance Procedures Manual ...
Page 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Page 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Page 50: ...Once complete follow the procedures to Install view port ...
Page 62: ...Once complete follow the procedures to Install view port ...
Page 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...