Removal
Prior to performing this procedure you must first follow
these procedures:
•
Shell/Bumper frame removal
Step 1
Place the LBV upside down.
Step 2 – Phillips #2 Screwdriver
Remove the 2 M4x6 Phillips pan head screws securing the rear
trim tab to the thruster Kort nozzles.
Step 3 – Phillips #2 Screwdriver
Remove the 3 Phillips pan head screws securing the lateral
thruster Kort nozzle to the lateral thruster. Remove Kort nozzle.
Step 4 – Phillips #2 Screwdriver
Remove the 2 M4x10 Phillips pan head screws at the rear of the
flotation module.
Summary of Contents for Generation 2
Page 1: ...Generation 2 Service Maintenance Procedures Manual ...
Page 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Page 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Page 50: ...Once complete follow the procedures to Install view port ...
Page 62: ...Once complete follow the procedures to Install view port ...
Page 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...