Removal
Prior to performing this procedure you must first follow
these procedures:
•
Flotation module removal
•
Shell/Bumper frame removal
Step 1
Place LBV on its side.
Step 2 - #2 Phillips Screwdriver
Remove the 3 Phillips pan head screws securing the lateral
thruster to the back plane.
Step 3
Carefully separate the thruster by pulling straight from the back
plane.
Step 4
Be sure to remove o-ring from back plane if stuck.
Summary of Contents for Generation 2
Page 1: ...Generation 2 Service Maintenance Procedures Manual ...
Page 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Page 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Page 50: ...Once complete follow the procedures to Install view port ...
Page 62: ...Once complete follow the procedures to Install view port ...
Page 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...