Vertical Thruster
Introduction
The LBV
2
is fitted with four (4) identical thrusters. They can be interchanged to any position.
Each thruster is isolated from the main housing and other thrusters. They have a four (4) pin
connector for power and data. There is an o-ring seal around the connector.
Work Environment
Prior to beginning ensure you have a clean and dry workspace. Locate the required tools and
parts and have paper towels available. It is a good idea to have a container to keep fasteners
in as they are removed. Read through the instructions fully prior to beginning and make sure
you understand what they are asking you to do.
Reading Manual
Below is a list of the required tools, estimated time to complete and level of difficulty. Next to
each step where a tool is required the tool is listed. Some of the steps have special notes that
must be observed.
Tools Required
•
#2 Phillips Screwdriver
•
O-ring lube
Time to complete
•
5 minutes removal
•
7 minutes install
•
25 minutes including
other procedures
Level of Difficulty
•
Easy
•
Care required
Prior to working on the LBV make sure the power is off
and the umbilical is DISCONNECTED.
Summary of Contents for Generation 2
Page 1: ...Generation 2 Service Maintenance Procedures Manual ...
Page 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Page 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Page 50: ...Once complete follow the procedures to Install view port ...
Page 62: ...Once complete follow the procedures to Install view port ...
Page 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...