
Removal
Prior to performing this procedure you must first follow
these procedures:
•
Flotation module removal
•
Shell/Bumper frame removal
Step 1
Place LBV upside down.
Step 2 - #2 Phillips Screwdriver
Remove the 3 Phillips pan head screws holding the port thruster
Kort nozzle in place and remove Kort nozzle.
Step 3 – 3mm Hex Ball Driver
Remove the 2 M5 button head cap screws securing the port
power can end cap to the back plane.
Step 4
Turn LBV on to its starboard side.
Summary of Contents for Generation 2
Page 1: ...Generation 2 Service Maintenance Procedures Manual ...
Page 13: ...Once complete follow the procedures to Install Shell Bumper Frame ...
Page 21: ...Once complete follow the procedures to Install flotation module Install Shell Bumper Frame ...
Page 50: ...Once complete follow the procedures to Install view port ...
Page 62: ...Once complete follow the procedures to Install view port ...
Page 101: ...Once complete follow the procedures to Install flotation module Install Shell Bumper frame ...