Description
Item
Description
Item
Low-Pressure Valve
8
Pump
1
Measuring Pump
9
High-Pressure Valve
2
Rinsing Port
10
Sample Loop
3
Drain (Waste Rinse Liquid)
11
Needle
4
Sample
12
Injection Port
5
Manual Prime Port
13
Column
6
—
-—
Rinse Solution
7
Start Analysis
When the needle is inserted in the injection port, the high-pressure valve shifts to the injecting position and analysis
starts. Along with the mobile phase solution, the sample goes through the high-pressure valve to the column.
Figure 2-13 Start Analysis
ExionLC
™
100 System
Hardware User Guide
37 / 219
RUO-IDV-05-1839-C
Overview