Figure 4-13 Connect Column Oven Tubing
4. Connect the red PEEK tubing from the outlet side of the column to the ion source.
5. Close the column oven door.
CAUTION: Potential System Damage. Be sure to lock the column oven door after closing
it to prevent the door from being opened by mistake during analysis or from being
opened while the tubing inside of the column oven is in contact with the door.
Attach Multiple Columns
Installing optional column clamps allows multiple columns to be attached.
Tip!
Installing the optional FCV-14AH valve allows automatic switching of multiple columns.
1. Install column clamps in the positions shown in the following figures according to the length and number of
columns.
•
100 mm to 300 mm columns:
Up to 3 columns can be attached. Install column clamps in pattern A
or B depending on the length of the columns.
•
Columns up to 100 mm:
Up to 6 columns can be attached.
ExionLC
™
100 System
Hardware User Guide
93 / 219
RUO-IDV-05-1839-C
Operating Instructions