en
17 /
Piping Systems for Hydraulic, Lubrication and Similar Systems
STD--Wa
07/3110
1099237
6
Final Mounting
After all pipes are pre--mounted with cutting--ring joints,
hoses, etc., the system can be completed.
During final mounting of the joints and later in the re-
peated mounting (each time after a connection was de-
tached), the tightening of the nut has to be carried out
without spanner extension and without increased ap-
plication of force.
While tightening the swivel nut during final mounting of
joints in free lines, the coupling is to be retained with a
second spanner (Figure 22).
Figure 22
!
ATTENTION
When filling in oil, pay attention to utmost cleanliness.
Also for new oil an according filling filter is to be used.
After mounting it is required to carry out a pressure test
for tightness.
In joints show leaks, tighten the swivel nut only until the
connection is tight.
Further tightening might damage the connection.
Finally, the entire system is to be rinsed, see SCHOT-
TEL Instructions 1100933.
Summary of Contents for SV 1
Page 10: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 66: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 80: ......
Page 98: ......
Page 108: ......