
Chapter 2
Installation
Electrical Installation
EM13x Series SMART MULTIFUNCTION METER
27
Figure
2-6b Typical Installation Diagram with Self Energized Power Supply – direct connection with HACS
*
*
1.
SATEC RF chokes to be installed between CBR and Meter
Voltage Inputs in residential area or other places require ANCI
C12.20 compliance. Otherwise it may be bypassed.
2.
AC0242 shall be routed with the voltage lines (bundled),
separately from communication & I/O lines