22
NOTE: It is necessary to wait until belt running stabilizes after each adjustment step and to adjust belt
alignment little by little. Belt running will not change immediately.
6-2. BELT ALIGNMENT ADJUSTMENT
After checking belt deviation, adjust each part following the procedures on p.22-23 while running
conveyor slowly.
Outline of belt alignment adjustment
When moving belt in direction of arrow , adjust each part as shown in figure below.
(To move belt in opposite direction of arrow , adjust each part oppositely to that shown below.)
1. Adjustment Using Take-up Knob
On side to which belt is deviating, turn take-up knob(*1) clockwise. Belt will then center itself.
Alternatively adjust on opposite side. In this case turn take-up knob(*1) counterclockwise.
NOTE: When drive unit is attached closer to conveyor tail rather than to conveyor center, turn take-up
NOTE:
knobs in opposite directions to those shown in figure, right.
2. Adjustment Using Head or Tail Pulley
On side to which belt is deviating, slightly turn adjustment screw(*2) clockwise. Head (or tail) pulley will
then move outward on this side and belt will center itself. Alternatively, on opposite side, if there is a
space between frame end and pulley bracket, make adjustment on this side. In this case slightly turn
adjustment screw(*2) counterclockwise to move head (or tail) pulley inward.
Summary of Contents for S-CON MINI-Z Series
Page 1: ...1 S CON MINI Z Series OPERATING AND SERVICE MANUAL...
Page 35: ...35 MEMO...