31
ENGLISH
Examples of draining work
X
f
Construct the drainage ditch with reinforced concretes and make sure that water-proofing work is done .
X
f
For smooth draining of defrost water, make sure to apply 1/50 slope .
X
f
Construct a drainage around the outdoor unit to prevent the defrost water (from the outdoor unit) from
stagnating, overflowing or freezing near the installation space .
X
f
When the outdoor unit is installed on the roof, check the strength and waterproof status of the roof .
(Unit : mm)
960
760
100
80
80
80
60°
100
X
X’
Direction of the
drainage (Slope 1/50)
<Drainage work for single installation>
B
A
50
100
150
100
<X-X’ SECTION>
80
80
80
80
80
80
80
80
60°
60°
200
B
B
200
Direction of the drainage
(Slope 1/50)
<Drainage work for module installation>
(Unit : mm)
Classification
Small type
Large type
Models
AM080/100/120
✴
XV
✴
G
✴
AM140/160/180/200/220/240/260
✴
XV
✴
G
✴
A
940
1,350
B
740
1,150
DVM S HE_IM_DB68-05461A-08_EN.indd 31
2017-03-24 오후 1:38:18
Summary of Contents for AM080JXVHGH/EU
Page 118: ...118 DVM S HE_IM_DB68 05461A 08_EN indd 118 2017 03 24 오후 1 38 49 ...
Page 119: ...119 ENGLISH DVM S HE_IM_DB68 05461A 08_EN indd 119 2017 03 24 오후 1 38 49 ...
Page 120: ...120 MEMO DVM S HE_IM_DB68 05461A 08_EN indd 120 2017 03 24 오후 1 38 49 ...
Page 121: ...121 ENGLISH MEMO DVM S HE_IM_DB68 05461A 08_EN indd 121 2017 03 24 오후 1 38 49 ...