Doc.-ID: 150903-PT08BA-TG-ExCam IPM1145-(L)_en_rev.02.docx, page 38 of 40
7
Maintenance / Servicing / Alterations
The national regulations concerning the maintenance and servicing of electrical devices
within hazardous areas are to be observed.
The required maintenance intervals are specific to the individual devices. The operating
company has to determine these intervals depending on the application parameters. Dur-
ing maintenance, focus has to be put on checking parts concerning the ignition protection
category such as the integrity of the housing, the sealings and the cable glands. If
maintenance measures are necessary they have to be initiated and/or executed.
8
Repairs and Maintenance
Repairs must only be carried out with original parts of SAMCON Prozessleittechnik
GmbH. Damaged pressure-resistant housings have to be replaced completely. If in
doubt, return the applicable part to SAMCON Prozessleittechnik GmbH.
Repairs concerning the explosion protection must only be carried out by SAMCON
Prozessleittechnik GmbH or a qualified electrical technician authorized by SAMCON
Prozessleittechnik GmbH in accordance with nationally applied regulations. Rebuilding of
or alterations to the devices are not permitted.
9
Disposal / Recycling
When disposing of the device, nationally applicable regulations must be observed.
This document is subject to alterations and additions.
10
Drawings
See CAD shapes at
http://samcon.eu