Doc.-ID: 150903-PT08BA-TG-ExCam IPM1145-(L)_en_rev.02.docx, page 19 of 40
5
Commissioning
Attention!
Please observe the national regulations regarding security, installa-
tion, and accident prevention (e.g. DIN EN 60079-14 or DIN VDE 0118-
1:2010-02) for the erecting of electrical plants in mining etc.) as well as
the safety guidelines described in this user manual and the EX instal-
lation manual!
Attention!
Please observe the installation and commissioning advices described
in the ATEX/ IECEx/ EAC-Ex Ex-installation manual!
5.1
Step 1: Installation
Install the ExCam
®
IPM1145-(L) at the desired location. Mounting options and conditions,
accessories, as well as safety guidelines are described in the EX installation manual of
the T08 ExCam
®
series.
5.2
Step 2: Electrical connection
Attention!
The electrical connection of the equipment must be executed by quali-
fied personnel only!
Attention!
It is mandatory that the housing of the ExCam
®
Series has to be
grounded via a PE-connection!
Attention!
The minimum cable length of the connection line must not be less
than one meter! The connection cable has to be laid in a protected
manner!
Attention!
Please observe the national regulations regarding security, installa-
tion, and accident prevention (e.g. DIN EN 60079-14 VDE 0118-1:2010-
02), as well as the safety guidelines described in this user manual and
the EX installation manual!