Reference Manual
00809-0100-4024, Rev BA
September 2005
2-21
Rosemount 5600 Series
8. Before mounting the transmitter head, visually verify that the quartz tank
seal is undamaged and free from moisture and dirt.
9. Place the protection sleeve on the flange.
10. Mount the transmitter head on the adapter in one of the four possible
positions.
Figure 2-32. Completed
mechanical installation
11. Check the guide pins on the adapter enter the corresponding grooves on
the upper wave guide. Maximum allowed spacing is 0.2-in. (5 mm).
Tighten the nut manually or with a wrench using approximately 20-50 Nm
torque until it stops on the adapter. It is normal that the transmitter head
can be rotated a fraction corresponding to the play between the guide
pins and the grooves. This will not have any negative impact on the
performance of the gauge.
Figure 2-33. Completed
Installation
12. Proceed with the electrical installation.
Quartz tank seal shall not be
removed when tank is
pressurized.
Summary of Contents for 5600 Series
Page 2: ......
Page 4: ......
Page 18: ...Reference Manual 00809 0100 4024 Rev BA September 2005 Rosemount 5600 Series 1 10 ...
Page 64: ...Reference Manual 00809 0100 4024 Rev BA September 2005 Rosemount 5600 Series 2 46 ...
Page 80: ...Reference Manual 00809 0100 4024 Rev BA September 2005 Rosemount 5600 Series 3 16 ...
Page 99: ...Reference Manual 00809 0100 4024 Rev BA September 2005 4 19 Rosemount 5600 Series ...
Page 100: ...Reference Manual 00809 0100 4024 Rev BA September 2005 Rosemount 5600 Series 4 20 ...
Page 174: ...Reference Manual 00809 0100 4024 Rev BA September 2005 Rosemount 5600 Series A 20 ...
Page 208: ...Reference Manual 00809 0100 4024 Rev BA March 2004 Rosemount 5600 Series Index 4 ...
Page 209: ......