![Rohde & Schwarz ZVT Series Getting Started Download Page 8](http://html.mh-extra.com/html/rohde-and-schwarz/zvt-series/zvt-series_getting-started_1477905008.webp)
Preparing the Analyzer for Use
R&S
®
ZVT
8
Getting Started 1300.0045.62 ─ 10
Fig. 1-1: R&S
ZVT front view
1.1.1 Standby Key
The standby toggle switch is located in the bottom left corner of the front panel.
The key serves two main purposes:
●
Toggle between standby and ready state.
●
Shut down the instrument.
1.1.2 Front Panel Connectors
The test ports and various additional connectors are located on the front panel of the
analyzer.
Front Panel Tour