
CTS-K6
Windows
Application CTSgo
1079.2001.01
25
E-3
6.3.2 Structure of GSM Autotest
Call clear-down
Further call
setup
?
Test evaluation
yes
no
Change of channel/PCL
Power/phase/frequency error measurements
Power reduction to BER level
Determination of BER, query of RXLev / RXQual
Preparation of test (further test runs)
Setting CTS output level
CTS basic configuration
Preparation of test (1
st
run)
Waiting for location update
Query of mobile specification (IMSI/IMEI/power class/phase)
Call setup
Further
test set
requested
?
no
yes
Other
PCL requested
in the test set
?
yes
no