10
Rockwell Automation Publication 2711T-QS002C-EN-P - March 2019
Second Generation MobileView Tethered Operator Terminal
6. Gently feed the three terminals at the end of the red cable into the chosen cable
connection and up through the cable channel.
7. When the three terminals reach the main circuit board, carefully plug each terminal into its
connection. See
for where each terminal is connected.
Each terminal is keyed and can fit only one way on its corresponding connection.
8.
After each terminal is securely connected, reinstall the back cover.
Use a Torx T10 screwdriver
to reinstall the three cover screws.
9.
Install the connector-cable mounting assembly into the cable connection of the second
generation MobileView 2711T terminal.
10. Reinstall the strain relief to the connector-cable mounting assembly.
11. Tighten the strain relief and the connector-cable mounting assembly with the 19 mm
open-end wrench or spanner.
Torque the connector-cable mounting assembly to 1.2 N•m (10.6 lb•in).
12. If you chose left-hand operation, reinstall the plug in the open cable-connection port
with an
8 mm hex key.
Torque the plug to 1.2 N•m (10.6 lb•in).
IMPORTANT
Do not force the cable terminals through the channel. If you encounter resistance,
slowly pull the cable towards you until it moves freely again.
If necessary, slide the connector-cable assembly farther down the cable to assist
cable feed through the channel.
IMPORTANT
Verify that there is a snap sound when you plug each terminal into its corresponding
connection, which confirms that the terminal is properly connected.