![Rockwell Automation Allen-Bradley MobileView 2711T-B10I1N1 Quick Start Manual Download Page 7](http://html1.mh-extra.com/html/rockwell-automation/allen-bradley-mobileview-2711t-b10i1n1/allen-bradley-mobileview-2711t-b10i1n1_quick-start-manual_1475897007.webp)
Rockwell Automation Publication 2711T-QS002C-EN-P - March 2019
7
Second Generation MobileView Tethered Operator Terminal
Risk Assessment of Machinery
For the risk assessment for the machinery, use the standards in ISO 12100, ‘Safety of machinery -
General principles for design - Risk assessment and risk reduction.’
The control system must be designed for the safety level that results from the risk assessment of
ISO 12100.
The Second Generation MobileView 2711T Terminal
This section provides details on the following topics:
•
•
Install the Connection Cable to the Second Generation MobileView 2711T terminal
Remove the Back Cover
This section shows how to remove the back cover of the second generation MobileView 2711T
terminal. When the back cover is removed, you have access to the area that contains all
connectors except the USB port.
1.
Place the second generation MobileView 2711T terminal with the display side down on
a stable, flat surface free of debris.
2.
Use a Torx T10 screwdriver to remove
the three screws that secure the back
cover.
3.
Carefully lift off the back cover and
set it aside.
shows the main circuit
board of the second generation MobileView
2711T terminal with the back cover removed.
SHOCK HAZARD:
Disconnect all power to the second generation MobileView 2711T terminal
before you remove its back cover.
When the back cover is removed, the second generation MobileView 2711T terminal is sensitive to
electrostatic discharge (ESD).
TIP
The ‘Image Applied’ label on
the back cover was part of the
manufacturing process. You can
remove and discard this label.
Back Cover