4
IMR01Y35-E3
2. HANDLING PROCEDURES
Conduct the setting necessary for performing communication in accordance with the following procedure.
To avoid error at operation start-up, COM-JG must be powered on LAST (after the
controller, PLC, etc.).
Mounting
Install the COM-JG.
•
Refer to
3. MOUNTING (P. 5)
•
For controller (SRZ), refer to
Z-TIO INSTRUCTION
MANUAL (IMS01T01-E )
or
Z-DIO
INSTRUCTION MANUAL (IMS01T03-E )
COM-JG Setting
Wiring
and
Connection
Controller (SRZ) Setting
Communication Data
Setting
Set the PROFIBUS address and DIP switch setting of COM-JG.
Refer to
5. SETTING (P. 15)
Connect power supply wires to the COM-JG, and also connect
the COM-JG to the controller (SRZ) and the COM-JG to the
PLC, respectively.
•
Refer to
4. WIRING (P. 8)
•
For controller (SRZ), refer to
Z-TIO INSTRUCTION
MANUAL (IMS01T01-E )
or
Z-DIO
INSTRUCTION MANUAL (IMS01T03-E )
Set communication parameters of controller (SRZ).
•
Refer to
8.3 Use Instruments Setting (P. 62)
•
Refer to
Z-TIO Host Communication Quick Manual
(IMS01T02-E )
or
Z-DIO INSTRUCTION
MANUAL (IMS01T03-E )
Set PLC programming software STEP7.
Refer to
8.5 PLC Tool Setting (P. 70)
COM-JG Initial Setting
Set initial setting of the COM-JG.
•
Refer to
5.3 COM-JG Initial Setting (P. 17)
•
Refer to
5.4 Controller Address Auto Obtain
Methods
(P. 19)
•
Refer to
8.4 Contents Check of COM-JG Initial
Setting (P. 63)
•
Refer to
8.5 PLC Tool Setting (P. 70)