8
Regency GF950L-2 Gas Fireplace
installation
This includes:
1) Clocking the appliance to ensure the correct
firing rate (rate noted on label) after burning
appliance for 15 minutes.
2) If required, adjusting the primary air to ensure
that the flame does not carbon. First allow
the unit to burn for 15-20 min. to stabilize.
CAUTION: Any alteration to the product that
causes sooting or carboning that results
in damage is not the responsibility of the
manufacturer.
LOCATING YOUR
GAS FIREPLACE
A) Flat on Wall
B) Flat on Wall Corner
C) Recessed into Wall/Alcove
D) Corner
Diagram 1
1. When selecting a location for your fireplace,
ensure that the clearances are met.
2. The appliance must be installed on a flat,
solid, continuous surface. For example a
wood, metal or concrete floor. In a raised (on
the wall) application the appliance must be
installed on a metal or wood panel extending
the full width and depth of the appliance.
3. The GF950L Direct Vent Gas Fireplace can
be installed in a recessed position or framed
out into the room as in A, B, C and D. See
Diagram 1.
INSTALLATION CHECKLIST
IMPORTANT : Thought will need to be given
to determine how this will be finished. This
may be completed with either a combustible
finish and or non combustible finish option.
The clearance framing, mantle and finishing
requirements are all different depending on
the option chosen. See manual for full details
prior to beginning.
1. Locate appliance:
a) Room location (Refer to "Locating Your
Gas fireplace" section)
b) Clearances to Combustibles (Refer to
"Clearances" section)
c) Mantle Clearances (Refer to "Mantel
Clearances" section)
d) Framing & Finishing Requirements (Refer
to "Framing & Finishing" section)
e) Flueing Requirements (Refer to "Flueing"
section). Determine which flue option
will be used and if it will be terminated
horizontally and or vertically.
Optional flues are noted below.
-Non power Flue (Natural flue)
-Power Flue (End of line)
-Power Flue (inline)
2. Assemble the standoffs and nailing strips
(Refer to "Unit Assembly Prior to Installation).
3. Slide unit into place.
4. Install flue (Refer to "Flueing Arrangement"
sections).
5. Make gas connections (Refer to "Gas Line
Installation section).
6. Test the pilot (Refer to "Pilot Adjustment"
section).
7. Test Gas Pressure (Refer to "Gas Pipe Pres-
sure Testing" section).
8. Install standard and optional features. Refer
to the following sections:
a)
Log Install
b)
Faceplate / Door Frame Overlay
c)
Remote Control
9. Final check.
Before leaving this unit with the customer, the
installer must ensure that the appliance is firing
correctly and
operation fully explained to
customer.
4. The GF950L Direct Vent Gas Fireplace is
approved for alcove installations, see "Clear-
ances" section for details.
5. We recommend that you plan your instal-
lation on paper using exact measurements
for clearances and floor protection before
actually installing this appliance. Have an
authorized inspector, dealer, or installer
review your plans before installation.
Note: For flue terminations refer to "Exterior
Flue Termination Locations" section.
NOTE:
"NOT INTENDED FOR
MASONRY INSERT. DO NOT
INSTALL IN A MASONRY
FIREPLACE".
PACKAGING:
The unit and its contents are packaged to
prevent damage during transport.
After unboxing, remove the plastic wrap
then the screws that secure the unit to the
pallet. Before commissioning of the unit,
carefully remove the logs from inside of
the unit, unwrap each log and set aside.
Before installation of the logs, removal of
the sheet metal cover that protects the
burner is required.
Refer to subsequent instructions on proper
set up and safety check before placing unit
into commission.
Summary of Contents for Greenfire GF950L Series
Page 93: ...Regency GF950L 2 Gas Fireplace 93 NOTES notes ...
Page 100: ......
Page 101: ...Regency GF950L 2 Gas Fireplace 101 NOTES notes ...
Page 102: ...102 Regency GF950L 2 Gas Fireplace NOTES notes ...
Page 103: ......