64
Regency GF950L-2 Gas Fireplace
GAS POWER FLUE INSTALLATION - END OF LINE POWER FLUE
13-1/2"
(343mm)
Determine
the correct
height
13-1/2"
(343mm)
WARNING
ELECTRICAL CONNECTIONS SHOULD ONLY BE
CARRIED OUT BY A QUALIFIED AND LICENSED ELEC-
TRICIAN
1. Frame an opening to the outside of the building at 343mm W x
343mm H to accommodate the Power Flue.
2. Run the flueing and power flue wire harness from the unit to the framed
opening.
5. Install Power Flue unit into framed opening using 4 screws as shown below.
6. Seal the edges of the Power Flue unit to the framing (there are two seams).
Seal behind flange with silicone--
screw against Plywood siding. Wipe
any excess silicone off outer flange
after flange is screwed down.
Silicone edge of inner trim
against siding of structure,
wipe any excess silicone off
trim.
Fan discharge
opening
343mm
343mm
3. Determine the building finishing material thickness.
4. Depending on the building material thickness, install the frame onto the Power
Flue mount using 4 screws. Mounting holes start at 51mm from the front of
the Power Flue unit cover and can be adjusted back in 19mm increments.
NOTE: Exterior finishes such as thin vinyl siding may warp if closer than
51mm from the flue. For interior installations on vinyl siding, a 51mm
frame/buffer zone must be created between the finishing and the flue.
Determine protrusion
Determine finishing
Set frame depth
(starting @ 2" of
faceplate protrusion)
material thickness
of faceplate
Adjustable Power Flue Frame
installation
Summary of Contents for Greenfire GF950L Series
Page 93: ...Regency GF950L 2 Gas Fireplace 93 NOTES notes ...
Page 100: ......
Page 101: ...Regency GF950L 2 Gas Fireplace 101 NOTES notes ...
Page 102: ...102 Regency GF950L 2 Gas Fireplace NOTES notes ...
Page 103: ......