Installation Overview
Note:
For other makes/models, locate a source within the cab that will 12 V
constant power, +12 V key switch power, and a ground.
2. The OMNiDRIVE™ system should now be installed on the combine. Review the "Install-
ation Overview" on page 23 to confirm all procedures have been completed.
Tractor Installation
Tractor Kit Contents
Note:
During the installation process, note the serial number and bar code of the following
devices and the machine on which each device is installed:
l
Slingshot®Field Hub
l
RS Lite
l
Perception Controller
This information will be required during device registration and field provisioning
procedures and will help locate each device within the Slingshot® portal.
Note:
Please allow up to 4 business days to activate the Field Hub. Once activation has been
completed, a confirmation email will be sent to the customer and an
OTA
1
software update
will be pushed to the Field Hub the next time the device powers up. It may be recommended
1
(Over the Air) Software updates and other information pushed from Slingshot® servers via
the Slingshot® system.
55
Summary of Contents for OMNiDRIVE
Page 2: ......
Page 30: ...Chapter 2 30 ...
Page 36: ...Chapter 2 36 ...
Page 42: ...Chapter 2 OMNiDRIVE System Diagram Combine 42 ...
Page 75: ...Installation Overview 75 ...
Page 121: ...Installation Overview 2 Connect the autonomous bypass switch to the arm rest cable 121 ...
Page 130: ...Chapter 2 2 Connect the autonomous bypass switch to the arm rest cable 130 ...
Page 192: ...Field Provisioning Overview 192 ...
Page 220: ...2 Next select Applications then StarFire and select the Setup tab 220 ...
Page 261: ......
Page 275: ......