![Raven OMNiDRIVE Installation And Operation Manual Download Page 110](http://html.mh-extra.com/html/raven/omnidrive/omnidrive_installation-and-operation-manual_788984110.webp)
Chapter 2
3. Connect the RS Lite Ethernet cable (P/N 420-2002-085) to the RS Lite.
Note:
During the installation process, note the serial number and bar code of the
following devices and the machine on which each device is installed:
l
Slingshot®Field Hub
l
RS Lite
l
Perception Controller
This information will be required during device registration and field provisioning
procedures and will help locate each device within the Slingshot® portal.
Note:
Please allow up to 4 business days to activate the Field Hub. Once activation has
been completed, a confirmation email will be sent to the customer and an
OTA
1
software update will be pushed to the Field Hub the next time the device powers up. It
may be recommended to complete and submit the
OLAF
2
procedures for the Field
Hub on all OMNiDRIVE™ machines. Refer to the following for additional assistance:
l
"Activate the Slingshot® Field Hub for the OMNiDRIVE™ Tractor" on page 147
l
"Activate the Slingshot® Field Hub for the OMNiDRIVE™ Combine" on page 198
1
(Over the Air) Software updates and other information pushed from Slingshot® servers via
the Slingshot® system.
2
Online Activation Form
110
Summary of Contents for OMNiDRIVE
Page 2: ......
Page 30: ...Chapter 2 30 ...
Page 36: ...Chapter 2 36 ...
Page 42: ...Chapter 2 OMNiDRIVE System Diagram Combine 42 ...
Page 75: ...Installation Overview 75 ...
Page 121: ...Installation Overview 2 Connect the autonomous bypass switch to the arm rest cable 121 ...
Page 130: ...Chapter 2 2 Connect the autonomous bypass switch to the arm rest cable 130 ...
Page 192: ...Field Provisioning Overview 192 ...
Page 220: ...2 Next select Applications then StarFire and select the Setup tab 220 ...
Page 261: ......
Page 275: ......