3
Manual No. 016-0171-148
17
Installation
Cable Platforms and Connections
Two cable platform options are available for use with the Envizio Pro or Envizio Pro II field computers. Each
platform offers a range of optional features which can be added to the control system at any time.
Generation 1 Cable Connections
Important:
Ensure that the Envizio Pro or Envizio Pro II field computer has been properly mounted and all
component cabling is connected properly before connecting the Envizio Pro or Envizio Pro II to power.
FIGURE 4.
Generation 1 Main Interface Cable Connection Diagram
NOTICE
Please review the
Raven CANbus Network
Installation Manual
for installation instructions
for the specific cable platform being installed
with the field computer prior to beginning
installation. Contact a local Raven dealer for
assistance or to purchase additional
components necessary to set up the CANbus
system.
+12V DC
GND
Auxiliary
Power Output
3 Amps Max.
Ext. Switch
+12V Switched
Console
DGPS
CANbus
To Field Computer
Main Interface Port
Summary of Contents for Envizio Pro
Page 1: ...Software Version 3 2 Envizio Pro Envizio Pro II Installation Operation Manual...
Page 36: ...Chapter 3 26 Envizio Pro and Envizio Pro II Installation and Operation Manual...
Page 148: ...Chapter 7 138 Envizio Pro and Envizio Pro II Installation and Operation Manual...
Page 158: ...Chapter 8 148 Envizio Pro and Envizio Pro II Installation and Operation Manual...
Page 174: ...Chapter 9 164 Envizio Pro and Envizio Pro II Installation and Operation Manual...
Page 178: ...Chapter 10 168 Envizio Pro and Envizio Pro II Installation and Operation Manual...
Page 184: ...Chapter 11 174 Envizio Pro and Envizio Pro II Installation and Operation Manual...
Page 210: ...Appendix D 200 Envizio Pro and Envizio Pro II Installation and Operation Manual...
Page 230: ...Index 220 Envizio Pro Envizio Pro II Installation Operation Manual...