Operating Instructions D50+ | P50+ | SHERAprint 50
69
│
96
Rapid Shape GmbH
│
DOCR000438
10
Cleaning & Maintenance
10.1
Overview of the Cleaning & Maintenance Work
Interval
Activities
See Chapter
Daily
Cleaning the protective glass
→
Daily
Cleaning the build platform
→
Daily
Cleaning the knife
→
Daily
Cleaning the knife drip guard
→
Daily
Cleaning the material reservoir
→
Daily
Cleaning the collection basket
→
Weekly
Calibrating the exposure unit
→
Weekly
Checking the separation unit
→
Weekly
Checking the refill unit
→
Monthly
Checking the parallelism
→
As required
Performing automatic reservoir cleaning
→
As required
Cleaning the hose
→
As required
Changing the knife
→
As required
Changing the hose
→
NOTE!
This work is only to be carried out in a UV-protected
space to avoid the polymerisation of material residues
on individual components during cleaning and
maintenance work.
NOTE!
To prevent soiling the machine, the knife and the build
platform have always to be removed first before
removing the reservoir from the machine.
The cleaning and maintenance of the machine is an
integral part of a properly functioning machine. It is
therefore essential to observe the prescribed cleaning
and maintenance work.
All other maintenance work is only allowed to be
carried out by the Rapid Shape Customer Service.
For further information please contact Customer
Service.