Operating Instructions D50+ | P50+ | SHERAprint 50
Rapid Shape GmbH
│
DOCR000438
26
│
96
4
Installation
4.1
Setting Up
4.1.1
Requirements for the Installation Location
Please observe the requirements for the installation site listed below in
order to provide the best conditions for correctly operating the
machine:
–
Separate room with dust-protected workspace away from other
work being performed.
–
Climate-controlled environment with an adequate supply of
fresh air/air exchange.
–
UV-protected environment (protected from direct sunlight).
–
Stable base for setting up the machine with adequate space on
all sides (approx. 50 cm).
–
Connection to a LAN network/active internet.
–
Uninterrupted power supply.
The following requirements for the installation location are optional:
–
UAV power source
–
Compressed air supply (max. 2 bar)
4.1.2
Setting Up the Machine
Figure 9: Spirit levels
For setting up the machine please proceed as follows:
1.
Prerequisite: The machine has already been fully connected.
→
Chapter 3.2
2.
Push the unpacked machine on the castors to the desired
location.
3.
Lock the arresters on the front two castors on the machine.
4.
Open the upper hood: To do this, grasp the hood handles on
the left and right of the upper hood and pull it upwards until it is
fully open.
5.
Now locate both spirit levels on the machine. The spirit levels
are located on the left and right-hand side in the machine
reference plate. (see fig. on the left)
6.
Use the spirit levels to check that the machine is aligned in a
horizontal position. The air bubbles inside the spirit levels need
to be inside each of the reading rings.
The machine needs to be aligned if only one air bubble is
outside a reading ring.
→
Chapter 4.1.3
7.
Connect the machine to the power supply and the network.
→
Chapter 4.2