- 98 -
9901.00.34DE00; 02.2017
Subject to technical modifications
M
AINTENANCE
S
UPER
A
LBATROS
140 MW; S
ERIES
2
38 M
AINTENANCE
SCHEDULE
NOTE
As proof that the maintenance tasks have been performed,
particularly those on the hydraulic system, they should be logged.
Tasks
Information on page
By
When
4XDOL¿HGSHUVRQ
Service centre /
Specialist
4XDOL¿HGSHUVRQVIRU
pressure tanks and
pipelines
$IWHU¿UVWXVH
Every 50 operating
hours
After cleaning
Every 6 months
Every 12 months
Check the top link, bottom link and axle
head bolts for wear
+
Lubricate all lubricating points
99
+
+
+
Keep the adjusting spindle serviceable
100
+
Grease the adjusting spindles
100
+
Check all piston rods for wear or damage
+
Check the wheel bearings on the depth
control wheel or the combination wheel for
wheel bearing play.
+
Check tightness of all screws.
101
+
+
Hydraulic
hose
Check for tightness
+
Check for leaks
102
+
Pressure tank
Check for tightness
+
Check for damage
(Visual inspection)
+
&KHFNWKHJDV¿OOLQJSUHVVXUH
RIWKHQLWURJHQ¿OOLQJV\VWHP
+
General maintenance
Maintenance in accordance with the
operating and maintenance instructions
from the pressure tank manufacturer.
Wear parts
Check the plough bodies
+
Check the trash boards
+
Check the subsoiler
+
Check the skimmer
+
Check the disc coulter
+
Safety symbols
96
+
Repair damage to the paintwork
+