- 64 -
9901.00.34DE00; 02.2017
Subject to technical modifications
O
PERATION
S
UPER
A
LBATROS
140 MW; S
ERIES
2
Turning the wheel console into the working position
... im Einsatz
... au tra
vail
... w
ork
ing position
9998
.02
.78
... im
Transpor
t
... position tr
anspor
t
... transpoer
t position
1.
2.
T
3.
T = transport position
Ź
1.) Remove the hinged pin.
Ź
2.) Remove the locking pin.
Ź
3.) Turn the wheel console into the working
position.
... im Einsatz
... au tra
vail
... w
ork
ing position
9998.02.78
... im
Transpor
t
... position tr
anspor
t
... transpoer
t position
5.
4.
A
A = Working position
Ź
4.) Insert the locking pin and ...
Ź
5.) ... secure with the hinged pin.
20.3 Lowering the plough with depth
control wheel into the working
position
Transport position - Depth control wheel
Ź
Lower the plough from the transport
position into the working position.
20.4 Moving the subsoiler into the working
position
Adjustment instructions
L
A
Before starting work, the subsoiler on the ground
side must be moved from the storage position (
L
)
to the working position (
A
).
Required tools
•
2 ring spanners with a 24 mm width
•
Torque spanner