Hardware Installation
3-8
3
2.
Pan the antenna horizontally back and forth by rotating the mounting bracket
around the pole while checking the RSSI voltage.
3.
Find the point where the signal is strongest (highest voltage) and secure the
mounting bracket firmly to the pole.
Note:
Sometimes there may not be a central lobe peak in the voltage because vertical
alignment is too far off; only two similar peaks for the side lobes are detected. In
this case, fix the antenna halfway between the two peaks.
4.
Loosen the vertical adjustment nut on the mounting bracket and tilt the antenna
slowly up and down while checking the RSSI voltage.
5.
Find the point where the signal is strongest and secure the vertical adjustment
nut.
6.
Remove the voltmeter cable and replace the RSSI connector cover.
Summary of Contents for WB2011
Page 1: ...User Guide...
Page 2: ......
Page 3: ...User Guide Guide Outdoor 5 GHz Wireless Bridge IEEE 802 11a Wireless Bridge...
Page 4: ...WB2011 F1 1 1 0 E102004 R01...
Page 14: ...Contents x...
Page 44: ...Initial Configuration 4 8 4...
Page 140: ...Command Line Interface 6 60 6...
Page 142: ...Troubleshooting A 2 A 5 If you forgot or lost the password Contact Technical Support...
Page 155: ...Index 4 Index...
Page 156: ......
Page 157: ...WB2011 E102004 R01...