![QubicaAMF Express 294-115-200 Operation, Maintenance And Parts Manual Download Page 25](http://html1.mh-extra.com/html/qubicaamf/express-294-115-200/express-294-115-200_operation-maintenance-and-parts-manual_3559255025.webp)
Operation
400-294-002
Rev. Date: 01/07
2-11
2.6 CLEANING
OPERATION
COMPONENTS
The components used in the cleaning operation are shown in Figures 2-10 and 2-11, and
described below.
ID Component
Description
1 Cleaner
Tank
(Figure 2-10)
This tank holds the cleaner. It holds enough cleaner to
clean a minimum of 12 lanes. Because the tank is
designed to not drip when the machine is tipped into its
the storage position, you can leave cleaner in the tank.
2 Spray
Heads
(Figure 2-10)
The three spray heads distribute the cleaner on the lane.
The spray head pattern is set to overlap and to distribute
more cleaner in the areas where the oil pattern is
thicker.
The spray head positions can not be adjusted.
Refer to the Troubleshooting section for information
about how to clear clogs and how to change the amount
of cleaner dispensed from the spray heads.
3 Vacuum
Hose
(Figure 2-10)
This flexible tube is used to transport the residue from
the Vac Head to the waste tank.
The hose slips onto the waste tank inlet tube. This slip
fitting makes it easy for you to take off the hose when
you remove the waste tank.
Figure 2-10
2
3
1
4
Summary of Contents for Express 294-115-200
Page 2: ......
Page 4: ...ii...
Page 6: ...iv...
Page 80: ...Troubleshooting 4 10 Rev Date 01 07 400 294 002 This page intentionally left blank...
Page 83: ...Parts 400 294 002 Rev Date 01 07 5 3 MISCELLANEOUS...
Page 85: ...Parts 400 294 002 Rev Date 01 07 5 5 294 115 116 Wiring Diagram...
Page 87: ...Parts 400 294 002 Rev Date 01 07 5 7 FRAME and BODY...
Page 107: ...Parts 400 294 002 Rev Date 01 07 5 27 VACHEAD and CLEANING...
Page 117: ...Parts 400 294 002 Rev Date 01 07 5 37 CONDITIONING Oiling and Buffing...