
7.3.6 Entering Setting Value
7.3.6.1 S/N
• Enter shipment value from the factory (a subsequent modification is not available.)
7.3.6.2 Region
• Select a city and enter the city name for installation on the menu.
7.3.6.3 Country / Region Configure
• Save the selected Country / Region and proceed to the next step.
7.3.6.4 PV Install Value
• Enter installation capacity of each PV string.
• Enter by typing by hand.
7.3.6.5 Sever IP & Port
• Enter as basic value.
• Perform any modification for relevant issues only.
7.3.6.6 Energy Meter Selection
• Meter Type
-
RS-485
• RS-485 Meter model selection
-
Energy Meter recommends using EM24.
Refer to the Quick Guide for Energy Meter self-configuration and installation.
7.3.6.7 Date / Time setting
• Enter the current date and time.
7.3.6.8 Save and Restart
• Save onto the system after all the procedures above are completed.
7.3.6.9 Grid Feed in Limit Regulation Setting
• For some countries that have a regulation for the Grid feed in limit, the device allows the installer
to set up a limit value. You can select the required limit value in the [Feed in Limit Percentage]
on the set up screen. The selectable values is 0%,10%,20%,30%,40%,50%,60%,70%,80%,90%,
and unlimited. The term unlimited means that is that there is no Grid feed-in limit.
Entering Initial Installation Information
I
62