![background image](http://html.mh-extra.com/html/q-cells/q-home-ess-hyb-g2/q-home-ess-hyb-g2_installation-manual_764141036.webp)
[ Table 5-5 : Front Case Open Process ]
29
I
Electrical Connections
(A), (C) Screw
L : 75mm
(B), (D) Screw
L : 35mm
Front View
Side View
5.2 Opening the Front Case Cover
As shown in the [Table 5-5], The Q.HOME+ ESS HYB G2 front cover consists of a top cover with LCD and
LED, and a bottom cover for electrical connection. Do not remove the top cover except for special events
(A / S). The Battery pack also has the same method of opening the bottom cover.
NOTICE
The LCD connector and ground are connected to center of top cover. Be careful when
you detach the front cover. Make sure to connect the connector and ground before
reassembling the front cover.
Turn the screws (A, B, C, and D)
counterclockwise to disassemble.
Insert the flat-head screwdriver
as shown below and lift it up.
A
B
C
D