35
I
Electrical Connections
[ Figure 5-15 : Electric Cable Connection for Energy Meter Installation ]
5.6 An Installation Method of Energy Meter Electrical Connection
The electrical installation method of the digital energy meter (energy meter) must comply with installation
method provided by the digital energy meter manufacturer. However, the digital energy meter must be
selected.
The [Figure 5-15] shows the electrical cable connection and the communication lines of the digital energy
meter. Refer to the [Figure 5-15] and the communication description in Chapter 6 to install the digital
energy meter.
The end system of the used lead wiring may be different with the energy meter chosen.
Therefore, refer to the energy meter manual.
Grid Output
Power
Load Output
Power(Sub)
Load Output
Power(Main)
Battery
Power
Energy
Meter for
Utility
PV Input
Power