CAUTION!
Correct sensor operation / Run-in period
Damage to the product or its surroundings
– Correct measuring and metering is only pos‐
sible if the sensor is working perfectly
– Please read the operating manual for the
sensor
– Please also read the operating manuals for the
fittings and other components used
– It is imperative that the run in periods of the
sensors are adhered to
– The run in periods should be allowed for when
planning commissioning
– It may take a whole working day to run-in the
sensor
Measuring and control behaviour of the controller
during calibration
During calibration the actuating outputs are deacti‐
vated. Exception: a basic load or a manual control
variable has been set. This remains active. The
measured value output [standard signal output mA]
is frozen, corresponding to its settings in the mA
output menu.
When calibration/testing has been completed suc‐
cessfully, all of the error checks relating to the
measured value are restarted. The controller saves
all the determined data for zero point and slope
upon a successful calibration.
NOTICE!
Prerequisites for a correct calibration of the sensor
zero point
– The run in period for the sensor has been
adhered to
– There is permitted and constant flow at the in-
line probe housing
– There is temperature balance between the
sensor and the sample water
– There is a constant pH value in the permitted
range
1.
Press the key in the continuous display.
2.
Using the arrow keys select the
[Zero point]
3.
Then press
Calibrating the controller diaLog DACb