2. Assembly
18
1. Short describtion
Please read the safety instructions on page 12 before assembly and keep these instructions for future
reference.
1.
After removing the fixing elements, install the device.
2.
Check seal for good fit.
3.
Re-engage fixing elements and tighten clamping screws by hand. Then tighten further by half a turn
with the screwdriver.
ATTENTION! Torque should not exceed max. 0.1 Nm!
1. Short describtion
2. Assembly
The panel meter
UDA 50
is a 4-digit display for Pt100 sensors and a visual limit value monitoring via the
display. The configuration is done via three front keys or by means of an optional PC software PM-TOOL. An
integrated programming lock prevents unwanted changes to parameters and can be unlocked again via an
individual code.
The electrical connection is made at the back via plug-in terminals.
Selectable functions such as the min/max value query, a line adjustment up to 20°C and a direct limit value
adjustment in the operating mode round off the modern device concept.
Dich
tung
48,0
2
4
,0
3,0
54
,0
Ein
ba
uti
efe
in
kl.
An
sch
lus
skl
em
me
°C