75
Promega Maxwell
®
CSC 48 Instrument | TM623 | Revised 6/20
9.3 Repacking the Maxwell
®
CSC 48 Instrument
Preparation of the Maxwell
®
CSC 48 Instrument Prior to Repacking:
• Ensure that the cartridges and elution tubes have been removed from the instrument
platform.
• Turn off the instrument by pressing and holding the power button on the side of the
instrument for three seconds. Switch the rocker switch on the back of the instrument to the
Off position and unplug the instrument. Shut down the Tablet PC, and ensure that Tablet PC
and bar code reader are disconnected.
Repacking the Maxwell
®
CSC 48 Instrument
Note:
If you do not have the original Maxwell
®
CSC 48 Instrument packaging, please contact
Promega Technical Services or your local Promega representative to order Maxwell
®
CSC 48
Instrument packaging.
Ship the Maxwell
®
CSC 48 Instrument only with Promega packaging to avoid any damages.
1. Turn the instrument off and unplug it from the outlet.
2. Open the instrument door and manually push the deck to the back of the instrument.
3. Manually slide the plunger bar and magnet bar (Figure 60) down to insert the upper die-cut
foam.
Figure 60. Slide Plunger and Magnet Bars down, and insert upper die-cut foam.
Instrument Service