76
Promega Maxwell
®
CSC 48 Instrument | TM623 | Revised 6/20
9.3 Repacking the Maxwell
®
CSC 48 Instrument (continued)
4. Place the upper die-cut foam as shown in Figure 61.
Figure 61. Placement of upper die-cut foam.
5. Manually move the plunger bar and magnet bar (Figure 62) up to attach the shipping screws.
Figure 62. Placement of plastic stoppers.
Move the magnet and plunger bars up, and
secure the four shipping screws on both sides of the magnet and plunger bars.
6. Secure the four shipping screws by screwing them in on both sides of the magnet and
plunger bars as shown in Figure 62.
Instrument Service