![Primes HP-MSM-HB Original Instructions Manual Download Page 75](http://html1.mh-extra.com/html/primes/hp-msm-hb/hp-msm-hb_original-instructions-manual_1601727075.webp)
75
Revision 00 EN - 01/2021
HP-MSM-HB
35,0(6
17.4
Draining the cooling circuit of the PowerLossMonitor
I
f you are also using a PLM for the purpose of power measurement and you also want to store or transport
it, the cooling circuit of the PLM must also be completely drained. Storage or transport at a temperature
that is close to or below freezing can lead to damages due to the formation of ice, if the cooling circuit is not
completely drained.
NOTICE
Danger of damage of the turbine
The turbine is not designated for high rotational speed.
X
Do not use compressed air to purge the cooling circuit.
1. Remove cooling circuit hoses.
Cooling Circuit Connectors
2. Drain the cooling circuit completely.
3. Seal the connectors of the cooling circuit us-
ing the enclosed plugs.
17.5
Sealing the aperture of the HB objective
The magnetically held alignment tool may fall off during shipping. This could allow dirt to enter the objective.
The objective of the HP-MSM-HB must therefore be sealed for shipping with the enclosed black transporta-
tion lock.
1. Turn on the compressed air.
2. Remove the alignment tool.
3. Disassemble the cyclone.
4. Install the transport lock and the sealing ring
with 4 cylinder head bolts M3x8.
5. Turn off the compressed air.
Transportation Lock
Sealing Ring