![Primes BM+ 100 Operating Manual Download Page 71](http://html1.mh-extra.com/html/primes/bm-100/bm-100_operating-manual_1601731071.webp)
PRIMES
BeamMonitor BM+ with LDS 2.98
71
Revision 01/2018 EN
Assembly Order:
X
Please turn off the voltage supply.
X
Remove the plastic screws (D) on the detector.
D
D
Bild 1
X
Take the detector carefully out of the position and first
loosen the golden angle plug (A), then the black plug (B)
on the backside of the detector.
X
Please do not pull the cables!
Do not compress
here!
Touch here
Touch here
A
B
Bild 2
X
For the installation of the new detector, please first place
the foam rubber spacer (C) on the mounting surface of
the detector (picture 3). Then the cables are connected.
X
Please fasten the detector with the two plastic screws (D).
X
If the screws are tightened too firmly, they might
block the rotary disc!
X
Only tighten the screws
hand-tight.
X
The foam rubber spacer may be compressed to the half
of its original thickness only!
C
D
Bild 3