Page 26 of 89
(PVI-6000-OUTD-xx-AU Rev:1.0)
3.5.
Before performing the electrical connections
WARNING:
The electrical connections can be done only after Aurora
is firmly mounted to the wall.
WARNING
: The connection of Aurora to the electrical distribution grid
must be performed by qualified operators and anyway only after
receiving authorization from the utility that operates the grid.
WARNING:
For a step-by-step description of the correct procedure,
please read - and closely follow - the instructions provided in this
section (and its subsections) and all safety warnings. Any operation no
complying with the instructions below can lead to operator/installer
hazards and to equipment damage.
WARNING:
Always respect the nominal ratings of voltage and current
defined in Section 8 (Technical Characteristics) when designing your
system. Please observe these considerations in designing the
photovoltaic system:
Maximum array DC voltage input to each MPPT circuit: 600Vdc
under any condition.
Maximum array DC current input to each MPPT circuit: 18Adc
under any condition.
WARNING:
Check the National and local standard regulations to make
sure your electrical installation design is in compliance with them.
WARNING
: Cover the whole surface of the photovoltaic panels using a
(preferably black) material opaque to solar radiation during the
installation procedure. Remove the protective material when installation
is complete.
Summary of Contents for AURORA PVI-6000-OUTD-AU Series
Page 16: ...Page 16 of 89 PVI 6000 OUTD xx AU Rev 1 0 Fig 3C Integrated switch and diodes models...
Page 39: ...Page 39 of 89 PVI 6000 OUTD xx AU Rev 1 0 Fig 18 Data Transmission Options...
Page 70: ...Page 70 of 89 PVI 6000 OUTD xx AU Rev 1 0...