Assembly & Operation Manual
Note:
Output normalization
parameter of OD should be set into
After closing
mode.
If operation is performed via one relay,
Automatic closing
function should be
turned on in the control unit of OD of vehicle checkpoint, in such case a
minimum waiting period for automatic closing should be set -
Regulation
Т
.C.V.
(for CAME) and
PAUSE TIME
(for NICE).
3. Connect passage sensor to
XT1
connector block of the bottom board of the controller
in accordance with the scheme, shown on Figure 9. Use cable
№
4 for connection
(Table 6). If several sensors are connected, their outputs should be turned on
successively.
For
CAME
and
GENIUS
boom barriers infrared security sensors should be used as
passage sensors, connected to the control unit of ODs of vehicle checkpoint in a
standard way. In such case they are connected to the controller of vehicle checkpoint
with parallel connection.
For
NICE
and
FAAC
boom barriers the general principle of connection of infrared
sensor to the controller of vehicle checkpoint is depicted in examples of connection
schemes for control unit of corresponding model. Instead of
VD1
diode some other
decoupling circuit might be necessary.
Attention!
To ensure correct passage detection of a vehicle with a trailer or other parts
transparent for passage sensors, it is recommended to install several spaced-
apart sensors, or to set value of
Recovery delay of passage sensors
parameter sufficient for passage of transparent part of a vehicle by the sensor.
If there is no passage sensor is necessary to put tick at
Absence of passage
sensor
parameter in the software. In such case malfunction of OD of vehicle
checkpoint is possible, due to the impossibility to choose the optimal passage
period.
4. Fix cables with plastic ties to self-adhesive cable tie mount, included into delivery set,
by installing them inside the housing of the controller.
8.2.5 RC-panel configuration
The controller in the relevant configuration allows connecting the RC-panel to control
turnstiles, swing gates or OD of vehicle checkpoint. To connect the RC-panel to the
controller are used:
Three inputs to control the passage:
DUA, DUSt, DUB
;
Four outputs to control the indication of the RC-panel:
LdA, LdSt, LdB, Buzz
.
The connection is made to contacts of
XT2
connecting block (Figure 10)
.
The inputs
DUA, DUSt
and
DUB
in these configurations of the controller are activated by
low-level signals (normally opened contact) regarding
GND
contact. Settings of signals
that can be used for connection of the RC-panel are specified in Sections 5.5.2 and 5.6.3.
28
Summary of Contents for CT/L-04.2
Page 1: ...Controller CT L 04 2 ASSEMBLY AND OPERATION MANUAL...
Page 2: ...Controller CT L 04 2 Assembly Operation Manual...
Page 22: ...CT L 04 2 Controller Figure 3 Common scheme of connections 21...
Page 26: ...CT L 04 2 Controller Figure 6 Connection schemes of Turnstile control configuration 25...
Page 32: ...CT L 04 2 Controller Figure 13 Connection scheme of optional equipment to controller inputs 31...
Page 44: ...CT L 04 2 Controller Figure 15 Scheme of connection of the card capture reader IC 02 1 43...
Page 45: ...Assembly Operation Manual Figure 16 Scheme of connection of the card capture reader IC 05 44...
Page 70: ...www perco com...