6-23
Unpacking/
Installation
Location
Procedure
Check
1
(1) Install the NAC PCB to the its
mounting bracket. (2 screws)
2
(1) Remove the rear cover.
(7 screws)
3
(1) Remove the blind plate. (1 screw)
(2) Remove the system control PCB.
(5 screw)
(2) Installation
Remove all shipping materials before installation.
Caution: Make sure the copier is unplugged before installation.
1
1
2