6-17
Unpacking/
Installation
Location
Shipping material/Procedure
Check
8
(1) Open the front door.
(2) Remove the control panel mount-
ing screws. (2 screws)
(3) Remove the blind cover and
screw.
9
(1) Connect the control panel (C)
PCB harness to the control panel
(C) PCB.
(2) Connect the control panel (D)
PCB harness to the control panel
(C) PCB.
10
(1) Place the insulation sheet 1 onto
the control panel.
(2) Remove the ferrite core.
(3) Place the insulation sheet 2 onto
the control panel (C) PCB and
install them to the control panel
(4 screws).
(4) Connect the control panel (D)
PCB harness to the control panel
(B) PCB.
(5) Re-install the ferrite core.
3
1
2