![Overland Storage PowerLoaders AIT-2 User & Installation Manual Download Page 57](http://html1.mh-extra.com/html/overland-storage/powerloaders-ait-2/powerloaders-ait-2_user-and-installation-manual_1663070057.webp)
Operation
t
3-5
F
RONT
P
ANEL
Startup Display Messages
The display on the control panel is capable of displaying four lines of 20 characters each, to
allow the use of easy-to-understand messages. Many of these messages and their functions are
described in this chapter. Those displays that are described in other chapters are cross-
referenced here as well.
Power-On Self Test Screen
When power is first applied to the module, a series of power-on self test (POST) diagnostics are
performed. During POST execution, the model number of the module, the firmware revision,
and the status or result of the test in progress are displayed on the control panel.
Power-On Self Test (POST) Screen
When power is first applied to the module, a series of power-on self test (POST) diagnostics are
performed. During POST execution, the model number of the module, the firmware revision,
and the status or result of the test in progress are displayed on the control panel.
Figure 3–3. POST Screen
OVERLAND LIBRARYPRO
Firmware Level
Checking Hardware
0X.XX
Summary of Contents for PowerLoaders AIT-2
Page 1: ......
Page 4: ...ii u...
Page 13: ...xi LIST OF FIGURES CONT D...
Page 14: ...xii LIST OF FIGURES CONT D...
Page 16: ...xiv LIST OF TABLES CONT D...
Page 26: ...2 2 u Installation RELEASING THE LOCKDOWN MECHANISM Lockdown Screw...
Page 52: ...2 28 u Installation CONFIGURATION OPTIONS DESCRIPTION...
Page 96: ...5 18 u Troubleshooting ERROR RECOVERY...
Page 102: ...A 6 u Specifications SPECIFICATIONS...
Page 104: ...B 2 u...