VCB-X Operator Interface SD
VCB-X CONFIGURATION
37
VCB-X Con
fi
guration Screens
Con
fi
guration Screen #67 - Broadcast Building
Pressure
VCBX Cnfg ID 101
Broadcast Build. Pr.
NO
Use < Or > To Change
The VCB-X can broadcast Building Pressure from this unit to any other
unit requiring this value.
Select
YES for Broadcast Building Pressure.
Default is NO
.
Con
fi
guration Screen #68 - Broadcast to Boxes
VCBX Cnfg ID 101
Broadcast to Boxes
NO
Use < Or > To Change
The VCB-X can broadcast all applicable information and commands
to the VAV Boxes.
Select
YES for Broadcast to Boxes.
Default is NO
.
Con
fi
guration Screen #69- #72 - Cool/Heat
Stage Delays
VCBX Cnfg ID 101
Cool Stage Delays
Stage Up..: 3 Min
Stage Down: 1 Min
VCBX Cnfg ID 101
Cool Stage Delays
Min Run...: 5 Min
Min Off...: 3 Min
VCBX Cnfg ID 101
Heat Stage Delays
Stage Up..: 3 Min
Stage Down: 1 Min
VCBX Cnfg ID 101
Heat Stage Delays
Min Run...: 5 Min
Min Off...: 1 Min
Both the Heating Stages and the DX Cooling Stages utilize
Staging Up
and
Down
Delay Periods between stages and
Minimum Run
Times
and
Off
Times.
See the
VCB-X Controller Technical Guide
for information on how these
Delays and Run Times are used.
Description
Minimum
Default
Maximum
Cooling Stage Up
3 Min
3 Min
15 Min
Cooling Stage Down
1 Min
1 Min
15 Min
Cooling Min Run Time
5 Min
5 Min
15 Min
Cooling Min Off Time
3 Min
3 Min
15 Min
Heating Stage Up
3 Min
3 Min
15 Min
Heating Stage Down
1 Min
1 Min
15 Min
Heating Min Run Time
2 Min
5 Min
15 Min
Heating Min Off Time
1 Min
1 Min
15 Min
Con
fi
guration Screen #73 - Heat Pump Delays
- Aux Heat
VCBX Cnfg ID 101
Heat Pump Delays
Aux Heat..: 3 Min
[ 1 - 60 Minutes ]
If your VCB-X is con
fi
gured to operate as a Heat Pump, the Heat
Pump Auxiliary Heating Delay Setpoint can be con
fi
gured to provide
a time delay period before Auxiliary Heating Stages can be activated
once activation of the Compressor Heating Stages have been initiated.
Default is 3 minutes.
Description
Minimum
Default
Maximum
Aux Heat Delay
0 Min
3 Min
60 Min
Con
fi
guration Screen #74 - Heat/Cool
Changeover Delay
VCBX Cnfg ID 101
Heat Cool Changeover
Delay: 5 Min
Enter
the time in minutes for the time delay when the unit changes
over from a call to heating to a call to cooling and vice versa.
Default
is 5 minutes.
Description
Minimum
Default
Maximum
Heat/Cool Changeover
Delay
0 Min
5 Min
20 Min