Page:
25
Code:
000099BG
Chapter:
This document is the property of the Manufacturer and/or its
Agent and must not to be tampered with or changed, reproduced or provided to others without written consent.
5
Installation procedure
The installation is done bearing in mind the comments made above,
and following the procedure below in the order indicated:
- Position and level the machine.
- Clean especially the moving parts that rub against one another and
lubricate if necessary as described in the MaintEnanCE chapter.
- Press the red mushroom shaped EMErGEnCY button on the control
panel
13
.
- Wire the compressed air line (if applicable).
- Check that there are no foreign objects on the machine and that no
tools (
dies
06
) have been fitted yet.
- Fill the tank for the hydraulic unit
01
(see the MAINTENANCE chapter
for the type and technical characteristics table for the quantity of oil).