3
Performing a control solution test
39
If a control solution test is not performed within the 8-hour window, the next time
the meter is turned on, a test overdue
Reminder
screen will appear.
Receiving reminders
Whenever turning the meter on and it is time for a control solution test to be
performed, this
Reminder
screen will appear, within an 8-hour window of the
reminder settings. Press
to continue.
OK
Reminder
Perform a
control solution
test soon.
Last tested:
27 Apr, 07:30
OK
Reminder
Control Solution
test is overdue.
Last tested:
27 Apr, 07:30
Yellow = 5mm margin, Red = 7mm margin
Yellow = 5mm margin, Red = 7mm margin
AW05948101B_OT_V_OB_Insides_R1.indd 39
4/3/12 3:08 PM