
Table of Contents
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
4
Table of Contents
Introduction .................................................................................................. 1
IMPORTANT SAFETY INSTRUCTION ............................................................ 2
1.
SAVE THESE INSTRUCTIONS. ............................................................ 2
2.
SYMBOL ................................................................................................. 2
3.
INTERNAL BATTERY............................................................................. 2
4.
TEMPERATURE RATING ...................................................................... 2
5.
ENVIRONMENT ..................................................................................... 2
Procedure from installation to operation ............................................................. 3
Table of Contents ........................................................................................ 4
Safety Precautions ....................................................................................... 7
1
Preparation ............................................................................................. 1-1
1-1
Unpacking the product ........................................................................... 1-1
1-2
Checking the contents ............................................................................ 1-1
1-3
Name of each part .................................................................................. 1-3
1-4
Diagram of the Input/output circuit block ................................................ 1-7
2
Installation and connection ..................................................................... 2-1
2-1
Installation .............................................................................................. 2-1
2-2
Connecting the equipment ..................................................................... 2-3
2-2-1
Connecting a device to the power supply output ................................ 2-3
2-3
Connecting the AC input ........................................................................ 2-5
2-3-1
Connecting the AC input plug ............................................................. 2-6
2-3-2 Connecting to BN220T/BN300T input terminal block .......................... 2-9
3
Check and start operation ...................................................................... 3-1
3-1
The name and function for the operation and display ............................ 3-1
3-1-1
Name of each part .............................................................................. 3-1
3-1-2
The meaning of each LED .................................................................. 3-1
3-1-3
Switch ................................................................................................. 3-2
3-1-4
Beep sound ......................................................................................... 3-3
3-1-5
LCD status screen .............................................................................. 3-4
3-1-6
Status screen example ....................................................................... 3-5
3-1-7
Icons, LEDs, and beeps. ..................................................................... 3-5
3-1-8
Lower message ................................................................................... 3-8
3-2
Checking the operation ........................................................................ 3-9
Table of Contents
BN50T/BN75T/BN100T/BN150T/BN220T/BN300T
5
3-3
Start and stop procedures and basic operation .................................... 3-11
3-3-1
Start and stop procedures ................................................................ 3-11
3-4
Operation from the LCD menu ............................................................. 3-13
3-4-1
The menu screen for the UPS settings ............................................. 3-13
3-4-2
The menu list of LCD ........................................................................ 3-15
4
Maintenance and Inspection .................................................................. 4-1
4-1
Checking the battery .............................................................................. 4-1
4-1-1
Check the display on the estimated life expectancy of the battery ..... 4-1
4-1-2
Self-diagnosis test ............................................................................... 4-1
4-1-3
Estimated backup time ....................................................................... 4-2
4-2
Replacing the battery ............................................................................. 4-4
4-2-1
Notification that the battery needs to be replaced .............................. 4-4
4-2-2
Procedure for recycling the battery ..................................................... 4-5
4-3
Cleaning ............................................................................................... 4-17
5
To perform shutdown processing of the devices when a power failure occurs ..... 5-1
5-1
The outline on the UPS monitoring software .......................................... 5-1
5-1-1
UPS monitoring software function list ................................................. 5-1
5-1-2
The supported OS of the UPS monitoring software ........................... 5-3
5-2
When using the included UPS monitoring software ................................... 5-4
5-2-1
What is the PowerAct Pro ................................................................... 5-4
5-2-2
What is the Simple Shutdown Software.............................................. 5-4
5-2-3
How to connect ................................................................................... 5-4
5-3
When performing auto-save functions using the standard UPS service and the contact
signal card (SC07) ...................................................................................... 5-7
6
Using the contact signal functions .......................................................... 6-1
6-1
Contact signal functions ......................................................................... 6-1
6-2
SC07 Contact signal card specifications ................................................ 6-1
6-2-1
Contact signal connector (female D-SUB 9pin) .................................. 6-2
6-2-2
Type of Input/Output signals ............................................................... 6-2
6-2-3
Contact Signal ratings ......................................................................... 6-3
6-2-4
Contact Signal circuit .......................................................................... 6-4
6-2-5
Example of the use of the Contact Signal circuit ................................ 6-4
6-2-6
Items that can be set using the contact signal card ............................ 6-5
6-2-7
Insert method of contact signal card ................................................... 6-5
6-3
Remote ON/OFF connector ................................................................... 6-6
6-3-1
Type of Input signal ............................................................................. 6-6
6-3-2
Remote ON/OFF connector ................................................................ 6-6
Summary of Contents for BN100T
Page 2: ......
Page 24: ...1 Preparation BN50T BN75T BN100T BN150T BN220T BN300T 1 8...
Page 36: ...2 Installation and connection BN50T BN75T BN100T BN150T BN220T BN300T 2 12...
Page 54: ...3 Check and start operation BN50T BN75T BN100T BN150T BN220T BN300T 3 18...
Page 72: ...4 Maintenance and Inspection BN50T BN75T BN100T BN150T BN220T BN300T 4 18...
Page 88: ...6 Using the contact signal functions BN50T BN75T BN100T BN150T BN220T BN300T 6 8...
Page 94: ...8 Troubleshooting BN50T BN75T BN100T BN150T BN220T BN300T 8 4...
Page 96: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 2 2 FA OA 2 AC 50 60Hz AC AC...
Page 97: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 3 AC AC 3P 2P AC AC 5cm UPS UPS...
Page 99: ...9 Note of Chinese BN50T BN75T BN100T BN150T BN220T BN300T 9 9 5 1mA AC UPS AC UPS...
Page 109: ...Cut here...